Overview of Rapid Response and Ventilation Subgroup Training Materials

The Rapid Response and Ventilation subgroup of ITRC’s Vapor Intrusion Mitigation Training team prepared a fact sheet and three technology information sheets to support training on vapor intrusion (VI) mitigation:
• Rapid Response & Ventilation for Vapor Intrusion Mitigation Fact Sheet
• Heating, Ventilation, and Air Conditioning (HVAC) Modification Technology Information Sheet
• Indoor Air Treatment Technology Information Sheet
• Preferential Pathway Sealing & Ad Hoc Ventilation Technology Information Sheet
The information presented in the fact sheet and technology information sheets for this subgroup is supported by the following additional work products that were prepared by other subgroups within the Vapor Intrusion Mitigation Training team:
Conceptual Site Models for Vapor Intrusion Mitigation

o Conceptual Site Models for Vapor Intrusion Mitigation Fact Sheet
o Vapor Intrusion Mitigation Conceptual Site Model Checklist

o Public Outreach during Vapor Intrusion Mitigation Fact Sheet
Supporting Information for Design and Implementation of Mitigation Approaches

o Design Considerations Fact Sheet
o Post-Installation Fact Sheet
o Operations, Maintenance, & Monitoring/Exit Strategy Fact Sheet
The acronyms, glossary terms, and references cited in these documents are also available on the Vapor Intrusion Mitigation Training team website.
Return to the Interactive Directory of Vapor Intrusion Mitigation Training Team Work Products.