Vapor Intrusion Mitigation System
Operation, Monitoring, And Maintenance Checklist
Scope of Checklist: The purpose of this checklist is to guide the user during the inspection of a vapor intrusion mitigation system (VIMS) to (1) verify that the VIMS is operating as designed and (2) determine if certain operation, maintenance, and monitoring (OM&M) activities are necessary for continued operation and effectiveness of the system. This checklist is intended to provide factors to consider when documenting that the VIMS is operating and is effectively mitigating the vapor intrusion pathway during the lifecycle of its operation. Not all the information presented below is necessary to document system operation for all types of systems on all types of buildings, and some items may not be needed during every monitoring event. The user should be able to identify which criteria below best represent effective operation and responsible maintenance of their specific VIMS and if the conceptual site model (under which the system was designed) is still valid.
Prior to completing the inspection, it is recommended that the user review previously prepared OM&M plans. As-built drawings and performance (baseline) criteria are needed when conducting inspections of a VIMS. Monitoring scope, schedule, and methods may follow applicable agency requirements, which may be amended on a case-by-case basis through regulatory negotiation and approval. Where applicable, the monitoring and inspections must also comply with standards of practice and applicable codes (electrical code, building code).
In some situations, OM&M plans may not exist or be available or were not provided to a new operator or new building owner. Thus, the original as-built drawings and possibly the original performance criteria may not be known. In these cases, the checklist below can still be used to assist in developing the appropriate ongoing OM&M parameters for that particular site, although additional effort may be appropriate depending on the complexity of the building and site conditions.
A downloadable version of this checklist as a fillable form is available by clicking here.
1. Site Inspection Information
Address inspected:
Date of inspection: _____________________ Date of last inspection:
Inspector(s): _____________________ Title:________________ Company:
Building contact:____________________________________ Phone number:
Frequency of inspections:
____ Annual____ Semi-annual ___ Quarterly ___ Monthly ___Other (specify)________
Type of system being inspected: ________________________________________________
2. Mitigation System Operation
2.1 Was the mitigation system functioning as designed and operating upon arrival?
|
☐ Yes ☐ No ☐ NA |
2.2 Has the mitigation system been altered from what is shown in the as-built drawings?
|
☐ Yes ☐ No ☐ NA |
2.3 Has the mitigation system operated continuously since the last OM&M event?
|
☐ Yes ☐ No ☐ NA |
2.4 Have procedures and equipment been checked for proper and failsafe operation?
|
☐ Yes ☐ No ☐ NA |
2.5 Are labels identifying the system components in place and legible?
|
☐ Yes ☐ No ☐ NA |
2.6 Conduct a visual inspection of accessible system piping and pipe seals, including membrane seals (if applicable), connections, etc. Were any cracks/gaps or any changes in the system configuration observed?
|
☐ Yes ☐ No ☐ NA |
3. Building Conditions and Use
3.1 Is the building’s heating system or heating, ventilating, and air conditioning (HVAC) system operating?
Hours/day of HVAC operation__________________ |
☐ Yes ☐ No ☐ NA |
|
☐ Yes ☐ No ☐ NA |
|
☐ Yes ☐ No ☐ NA |
If yes, how many? ________ % opened ___________ |
☐ Yes ☐ No ☐ NA |
3.2 Has the building had a change in use since the system began operation? (i.e., Are the exposure assumptions still appropriate?)
|
☐ Yes ☐ No ☐ NA |
3.3 Has the building undergone any physical modifications (building additions, change to interior walls, new sumps or French drains, any new permits filed, etc.)?
|
☐ Yes ☐ No ☐ NA |
3.4 Has the condition of the basement (lowest floor) walls, floors, sumps, and utility penetrations been inspected for cracks, gaps, or seal failure?
|
☐ Yes ☐ No ☐ NA |
3.5 Has a visual inspection been conducted assessing the presence of moisture and/or efflorescence as crystalline deposits in the basement or lowest floor, including any crawlspaces?
|
☐ Yes ☐ No ☐ NA |
4. Monitoring and Diagnostic Measurements
4.1 Record vacuum and air flow at the suction point(s) and compare to baseline values (if applicable). Note: Field instruments such as a micromanometer can be used if in-line gauges/displays are not built-in. | |
|
☐ Yes ☐ No ☐ NA |
If not consistent, explain discrepancies in Section 5 and whether further corrective steps are necessary for the VIMS or actions taken. |
|
4.2 Record fan or blower/fan air flow and vacuum and compare to baseline values (if applicable) Note: Field instruments such as a hot-wire anemometer can be used if in-line gauges/displays are not built-in. | |
|
☐ Yes ☐ No ☐ NA |
If not consistent, explain discrepancies in Section 5 and whether further corrective steps are necessary for the VIMS or actions taken. |
|
4.3 Are telemetry systems indicating normal operating conditions? | ☐ Yes ☐ No ☐ NA |
Type of telemetry: ___________________ Location: _____________________ Summary of operating conditions: |
|
4.4 Did any telemetry system data show irregular entries or shutdown? | ☐ Yes ☐ No ☐ NA |
|
|
4.5 Conduct vapor concentration monitoring within system (if applicable). Field instruments need to be calibrated and meet detection levels of vapors being monitored. If no sampling ports are built into the system, conduct monitoring at the piping discharge/exhaust. Monitoring options include: a) field screening with a photoionization detector (PID) for total ionizable VOCs or flame ionization detector (FID) for total hydrocarbons, including methane b) landfill gas monitoring for oxygen, carbon dioxide, and methane to assess cross-slab leakage, and sub-slab ventilation rates c) whole gas (Tedlar bag, Summa canister, Bottle-Vac, etc., for analysis by USEPA Method TO-15 or similar) or sorbent sample (pumped ATD tube and TO-17 analysis). Holding time requirements of VOC samples for laboratory analysis need to be followed. |
|
Has there been a significant increase or decrease in concentrations since the previous monitoring event(s)? | ☐ Yes ☐ No ☐ NA |
|
|
|
☐ Yes ☐ No ☐ NA |
|
|
4.6 Record differential pressure (between sub-slab and indoor air) at monitoring points beneath the building floor slab if appropriate. Is the minimum differential pressure recorded at all monitoring points? | ☐ Yes ☐ No ☐ NA |
Discuss in Section 5 the reason(s) for any significant changes observed. Conduct a periodic leak check of the sampling probes if collecting soil gas samples. For locations where the minimum vacuum is not observed, consider additional data collection. |
|
|
☐ Yes ☐ No ☐ NA |
|
☐ Yes ☐ No ☐ NA |
|
|
4.7 Were indoor air samples collected for laboratory analysis as performance metrics? | ☐ Yes ☐ No ☐ NA |
|
|
4.8 Has a smoke test been conducted (if necessary) to verify the continued integrity of the liner?
|
☐ Yes ☐ No ☐ NA |
4.9 Has the appropriate frequency for system inspections been completed to date?
Current frequency of inspections__________________. |
☐ Yes ☐ No ☐ NA |
4.10 Were batteries replaced in any battery-powered alarms (if needed)? | ☐ Yes ☐ No ☐ NA |
4.11 Were additional items inspected?
|
☐ Yes ☐ No ☐ NA |
4.12 Was system component maintenance completed per equipment manufacturer specifications?
|
☐ Yes ☐ No ☐ NA |
5. Observations and Corrective Actions
Document observations and corrective actions or modifications made or planned to be made to the VIMS, and the results obtained to verify the effectiveness of the actions or modifications. Refer to the specific item number above for each observation or corrective action. Use additional pages as necessary.
6. Photographic Log
|
☐ Yes ☐ No ☐ NA |
7. Overall VI Mitigation System Assessment
|
☐ Yes ☐ No |
8. Inspector Information
Name: _______________________________
Signature: __________________________________
Date: ____________
Click here to view a PDF version of this Checklist.